Prakasam Barrage

Prakasam Barrage
Location of Prakasam Barrage
Country India
Location Vijayawada, Andhra Pradesh
Coordinates
Status Oprational
Construction began 1852
Opening date 1855
Dam and spillways
Type of dam Barrage
Length 1,223.5 m (4,014 ft)
Impounds River Krishna

The impressive structure of the Prakasam Barrage stretches 1223.5 meter long across the Krishna River connecting Krishna and Guntur districts. The barrage serves also as a road bridge and spans over a panoramic lake. The three canals associated with the barrage, run through the city of Vijayawada criss crossing it and giving it a Venetian appearance.

The idea of constructing a barrage across Krishna dates back to 1798. But it took some shape in the hands of captain Buckle and was revised in 1839 and 1841 by captain Best and captain Lake. After the endorsement of Major Cotton, the board of Directors of East India Company approved it on 5 January 1850. The barrage was started in 1852 and completed in 1855. Later the State Government constructed a new regulator cum-round bridge that was named after Sri Tanguturi Prakasam, the first Chief Minister of Andhra (A State formed in 1953, which later became Andhra Pradesh in 1956 after the merger of Telugu speaking districts of former Hyderabad State). Completed in 1957 it helps irrigating over 12 lakh (1.2 Million) acres of land. One of the first major irrigation projects of South India, the Prakasam Barrage in Vijayawada was completely successful in its mission.

Andhra Pradesh largely owes its richness in agriculture to the Prakasam Barrage as the project has helped in the irrigation of huge agricultural lands. The barrage provides gorgeous view with the shimmering lake. The balmy breeze and the placid waters make it one of the major travel attractions in Vijayawada. It is the largest in the Asian continent .

Gallery

See also